Michel Juillard michel.juillard@mjui.fr writes:
The preprocessor has become too complicated. I don't succeed in writing the interface for a list of graph formats. This will have to wait for Sébastien's return.
I’ve just added the preprocessor interface for multiple graph formats. The syntax is:
stoch_simul(graph_format = (eps, pdf));
As acknowledged, I’ve backported this to 4.3 as a special exception.
Thanks a lot. By the way I noted that parallel is broken in 4.3. I am about to push the fix to that best Marco
On 9/11/2012 2:28 PM, Sébastien Villemot wrote:
Michel Juillardmichel.juillard@mjui.fr writes:
The preprocessor has become too complicated. I don't succeed in writing the interface for a list of graph formats. This will have to wait for Sébastien's return.
I’ve just added the preprocessor interface for multiple graph formats. The syntax is:
stoch_simul(graph_format = (eps, pdf));
As acknowledged, I’ve backported this to 4.3 as a special exception.
Dev mailing list Dev@dynare.org https://www.dynare.org/cgi-bin/mailman/listinfo/dev